Scheduled Report Job stops running after 90 days

book

Article ID: 100042668

calendar_today

Updated On:

Description

Error Message

This issue is typically most noticable if notification is set up with the report job.  In those cases, the notifications continue but the report is no longer attached to the notification

Cause

The report job retention is tied to job history retention and the report will stop running when the job history retention period is reached.  Retention is 90 days by default

Resolution

Workaround:  Increase Job History retention to a larger number of days to allow the report job to run as scheduled longer.  This can be set up to a maximum of 999 days:

Image

 

Veritas Technologies LLC has acknowledged that the above-mentioned issue is present in the current version(s) listed under the Product(s) Section of this article. Veritas Technologies LLC is committed to product quality and satisfied customers.

There are currently no plans to address this issue by way of a patch or hotfix in the current or previous versions of the software at the present time. This issue may be resolved in a future major revision of the software at a later time. However, this particular issue is not currently scheduled for any release.  If you feel this issue has a direct business impact for you and your continued use of the product, please contact your Veritas Sales representative or the Veritas Sales group to discuss these concerns.  For information on how to contact Veritas Sales, please see http://www.veritas.com

Please be sure to refer back to this document periodically as any changes to the status of the issue will be reflected here.

Additional Information

ETrack: 3870675