------------------------------------------------------------
Info 6C8F1F65: The drive-based backup job, Drive Backup
of System Reserved (*:\), (C:\), has been started automatically.
------------------------------------------------------------
------------------------------------------------------------
Error EBAB03F1: Operation aborted.
Info 6C8F17E7: An automatic recovery point was not created
because an earlier recovery point from the same job was still in progress
------------------------------------------------------------
------------------------------------------------------------
Info 6C8F1F7D: A scheduled base recovery point of drive *:\ was created successfully.
Info 6C8F1F7D: A scheduled base recovery point of drive C:\ was created successfully.
------------------------------------------------------------
If "Schedule" job (Incremental) and "New Recovery Point Set" (base) are set at the same time,
base job is running and Incremental job is abandoned.
When incremental job is abandoned, Application Event Log shows the message as follows,
------------------------------------------------------------
Error EBAB03F1: Operation aborted.
Info 6C8F17E7: An automatic recovery point was not created
because an earlier recovery point from the same job was still in progress
------------------------------------------------------------

Schedule incremental job on other day.